遥控玩具产品质量计划(编辑修改稿)内容摘要:
d constant speed (1/3 sampled units) 5. Customer usage condition field test Outdoor or open field 5 rounds 1unit out of 1000 units Refer to for details 1. Run Straight line Angel deviation +/50 (TBD)cm / 1m 25 pcs. 2. Run L/R spin and figure 8 2 times/round 25 pcs. 3. Run Tank in different road condition (smooth/rough) 25 pcs. 4. Apply Forward/Reverse/Stop gear change 10 times/round 25 pcs. 5. Apply jump (curb drop) Curb drop 1 time/round (5 cm) 25 pcs. 6. Do the angel climbing in each round 35 degree/1time/round 25 pcs. 7. Apply the impact test in each round Forward/Left turn/Right turn /Reverse 25 pcs. 8. Confirm no Hand effect at control distance Touching Antenna with Hand. Control distance 50 %) 25 pcs. 9. Confirm the range meet the spec 6 meters 25 pcs. 10. Confirm both 49 MHz and 27 MHz versions and Channel A, B and C can be used together, with users side by side (as in a race, etc.) No interference/loss of range should occur 11. Confirm firmness of telescopic antenna Slightly over pull, extend amp。 retract 35 times 25 pcs. Drop test, bare unit (controller and RC Vehicle), and confirm they still function normally afterwards. Using Vendor Specification for height requirement. 13 Units Verify manually moving the unit using varied force and confirm the unit still operates normally afterwards Simulates a child pushing the tank around freely without using the remote control. Use Vendor spec for applied force/ resistance info. Verify manually moving the unit‟s turret and cannon using varied forces and confirm the unit still operates normally afterwards Simulates a child playing with the tank freely (without using the remote control.) Use Vendor spec for applied force/ resistance info. 更多免费资料下载请进: 好好学习社区 Page 11 of 22 Exercise removing the battery partment door, installing batteries and closing the partment door. Verify there is no damage/ intermittence to the partment door or battery terminals afterwards. (Stand, Controller, and Tank if applicable) Exercise removing and reinstalling the tread to the drive wheels and confirm no damage to the tread afterwards. Simulates removing tread to clean debris from wheels/ track and also simulates children taking tread off. Exercise the controller joysticks and confirm there is no damage/ intermittence afterwards. Confirm connecting the tank to the charging base 25 times and verify the charging indicator es on each time. Verify there is no damage/ intermittence to either unit afterwards. Confirm replacing the battery within the tank unit and verify the unit functions normally and there is no damage to the unit afterwards. Use NiMH Battery this is only suggested due to not having the prosample or an Owner‟s Manual to verify where the “BuiltIn” battery is replaceable. 13 Units 6. General test 100% units sampled In shield test room or cage Refer to page. 14 for details (All samples) 1. Check antenna tip secure and antenna mounting firmness Pull, Bend, extend, amp。 retract 35 times 2. Check TX control lever working condition Moving the level in any directions 510 times 3. Check the On/Off, switch fitness and intermittent Cycling the switch 510 times 4. Check battery door fitness amp。 effect of door lock on TX and Charger stand Open/close/shock/vibration/tapping 35 times 5. Check contact spring/plate secured amp。 plating condition Pull the contact spring/plate gently 6. Confirm no sharp edge/point 7. Check battery type/polarity indication 8. Check the TX/Tank and Charger, no part adrift Pulling/Tapping/Shocking 9. Put a Tank onto a plug on the Charger 10. Press down “CHARGE” button on the charger for charging 11. Confirm “Red” LED to light up while charging and it goes off when the charge is finished after about 180 seconds. 更多免费资料下载请进: 好好学习社区 Page 12 of 22 12. Remove the Tank from the charger stand then power switch to “ON” on the car. 13. Have Tank run with the following 3 rounds。 Straight Line (1meter) Car has a trimmer knob. Run Tank in L/R spins and figure 8 Conduct Forward/Reverse gear change Run impact test curb 4 times in each round Angle deviation is less than +/ 50 cm 2 times each round 10 times each round Forward, left turn, right turn, and reverse Endless Track must not e out of wheels. 14. Check Turret L/R turns mode. 15. Check Cannon and Machinegun modes to confirm sound e out of speaker on the Tank at 25 cm away from Tank‟s Turret. Cannon 60 dbA Machinegun 60 dbA 16. The Endless rubber track must not easily e out of wheel mechanism. 17. Change channel switch “A, B and C” on TX and RX on both 27 and 49 MHz, and make sure the Tank can be used together with users side by side (as in a race, etc.) No interference/loss of range should occur 7. Checking Internal structure of the reliability amp。 10 hour running test units 1 from running test, 1 from G/B drop test, 1 from hot, cold storage test Refer to for details Check the gear inside the gear box assembly 5 pcs. Check lubricant on the gear assembly 5 pcs. Check ponent amp。 wire dressing, soldering 5 pcs. Compare ponent/material/gear/motors with approved samples. 5 pcs. Comment: RadioShack Cat。遥控玩具产品质量计划(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。