led光源在景观设计中的应用-外文翻译-电子信息(编辑修改稿)内容摘要:

protect the landscape and environment, the prevention of lighting the visual impact, in order to beautify the day, under the artistic Lianghua night. This requires installation of lamps because of the structure and system to King, the architectural features to the system, many can not meet the standard lamps is more than required. LED lamps designed flexible, especially for the system to King because of the nonstandard lighting design, landscape lighting and visual coordination, beautify the environment to achieve a new level. Art of Landscape Lighting lamps is itself a development of Visual Arts, and the LED light source can be more creative art of landscape lighting to a higher realm. As the controllable LED good, rich colors, and microelectronic technology intelligent control, to all kinds of ideas can be colourful and exciting joyful rhythm, melody beautiful landscape lighting. Such as: LED lights Perak, Perak than the gasdischarge lamps to be much more longevity, not damaged, and rich colors. Another example: LED lights winds, just intelligent puter control, we can achieve No wind at the rapid rotation, and also enables automatic transmission and for the wonderful color changes. Similar ideas, as long as the inspiration, can achieve. 大连交通大学 2020 届本科生毕业设计(论文)外文翻译 Lighting sculpture category of development, any of the simulation, bionics, ics, cartoons, mercial, tourism and so on the various lighting sculpture, and sound can be bined LED technology and microelectronics control, when necessary, together with On the mechanical and electrical integration technology, developed to attract people39。 s attention a series of landscape lighting sculptures. LED lighting landscape of intelligent control technology, LED lighting landscape of intelligent control technology, a digital or analog technology, or puter control technology, for the most pact or embedded systems. Characteristics: high reliability, excellent prices。 many changes in patterns。 existing singlelight control, another group control mode。 many nonstandard design。 long long lamps or more (such as: longzone, many Wall linear layout)。 LED display technology and a lot of difference. According to the landscaping requirements, changes in control mode, gives to rich and colorful, beautiful melody, rhythm joyful feelings, sometimes to shake the core to give people a strong boost. According to LED controllable, and the characteristics of rich color, color constitute almost unlimited. In accordance with the principles of the three primary colors and grayscale digital control technology, on the principle of e。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。