比例积分微分控制器外文翻译(编辑修改稿)内容摘要:
t setpoint changes. Changes in feed water temperature constitute a disturbance to the shower process. In theory, a controller can be used to control any process which has a measurable output (PV), a known ideal value for that output (SP) and an input to the process (MV) that 无 锡 职 业 技 术 学 院 外文翻译 3 will affect the relevant PV. Controllers are used in industry to regulate temperature, pressure, flow rate, chemical position, speed and practically every other variable for which a measurement exists. Automobile cruise control is an example of a process which utilizes automated control. Due to their long history, simplicity, well grounded theory and simple setup and maintenance requirements, PID controllers are the controllers of choice for many of these applications. While PID controllers are applicable to many control problems, they can perform poorly in some controllers, when used alone, can give poor performance when the PID loop gains must be reduced so that the control system does not overshoot, oscillate or hunt about the control setpoint value. The control system performance can be improved by bining the feedback (or closedloop) control of a PID controller with feedforward (or openloop) control. Knowledge about the system (such as the desired acceleration and inertia) can be fed forward and bined with the PID output to improve the overall system performance. The feedforward value alone can often provide the major portion of the controller output. The PID controller can then be used primarily to respond to whatever difference or error remains between the setpoint (SP) and the actual value of the process variable (PV). Since the feedforward output is not affected by the process feedback, it can never cause the control system to oscillate, thus improving the system response and stability. For example, in most motion control systems, in order to accelerate a mechanical load under control, more force or torque is required from the prime mover, motor, or actuator. If a velocity loop PID controller is being used to control the speed of the load and mand the force or torque being applied by the prime mover, then it is beneficial to take the instantaneous acceleration desired for the load, scale that value a。比例积分微分控制器外文翻译(编辑修改稿)
相关推荐
s marketing performance (including sales, market share and profits, fame, etc.) level. As an emerging tourist real estate industry, Zhejiang Lianzhong Village Resources Development Co., Ltd. in real
国民经济适度增长、缓解就业压力、实现科教兴国、优化经济结构等方面,均发挥着越来越重要的作用。 国家财政部门和审计部门根据企业报送的会计报表,检查企业管理状况和财务状况;税务部门通过阅读企业的会计资料 ,了解企业税收缴纳情况及是否存在偷漏税现象;此外,企业会计信息还对政府部门实施合理的财政政策和货币政策提供依据。 同时,有利于财政部门对中小企业提供一定的扶住。
程中高压水喷出,此种喷水同超前探孔高压喷水相比炮孔长度短,直径小,没有套管防护,高压水离开掌子面后呈漏斗状扩散并将在一定距离上产生雾化,同时掌子面岩盘由于离高压水距离近,高压水对掌子面岩盘的威胁大。 3. 溶蚀裂隙或溶蚀管道高压喷水:是指在超前探孔和打炮孔的过程中未揭露高压水,而在放炮的时候将高压水揭露,此情况是由于高压水离掌子面较近,再加上高压水的随机性造成超前探孔和炮孔未揭露
step angle of degrees。 also have fivephase reaction. Noise, no torque has been set at a large number of out. Hybrid (HB), mon twophase hybrid, fivephase hybrid, threephase hybrid, fourphase hybrid,
tiple of 3 is also convenient as then the same trian gular waveform can be used as the carrier in all three phases,leading to some simplification in hardware. It is readily seen that as the where E
盖率达 70%以上,而我国才达到 45%。 5 第 2 章 .止退垫片冲模总体方案的确定 设计题目及主要参数 设计题目 M20 螺栓垫片冲压工艺及冲压模具设计 止退垫片主要参数 : 216。 36mm : 216。 20mm : 216。 28mm :宽为 4mm,长为: 4mm : t=1mm :中批 如图所示 零件名称:止退垫片 图表 止退垫片 冲压工艺与模具设计 冲压件工艺分析 ① .材料