模具毕业设计外文翻译--冷冲模具使用寿命的影响及对策(编辑修改稿)内容摘要:
nder, unloading and discharging parts binder ponents are blank holder, binder board. Blank holder pressure can drawing blank holder force, thereby preventing billets under the action of the tangential pressure arch formed folds. The role of pressure plate to prevent movement and bounce blank. Top of the device, discharge board39。 s role is to facilitate the pieces and clean up waste. Them by the spring, rubber and equipment, putting on the aircushion support, can move up and down, knocking out pieces of the design should have enough top output, movement to the limited spaces. Stripper plate area should be minimized or closed position in the operating groove milling out emptyhanded. Exposure of the stripper plate should have protection around the plate, to prevent finger inserted into or foreign objects inside, exposed surface edges should be blunt down. 4. Guide parts and guide sleeve guide pin is the most widely used part of a guide. Its role is to ensure punch the punching clearance when accurate match. Therefore, the guide posts, guide cover the gap should be less than the blanking clearance. Guide Post located next mold base, to ensure that the stroke bottom dead center, the lead column in the template on the face over the top for at least 5 to 10 mm. Guide columns should be arranged far away from the module and the pressure plate in the area, so the operator39。 s arms do not get to take over the lead column material. 5. Supporting and clamping the upper and lower parts which includes templates, die handle, fixed plate punch, plate, stopper, etc.. Up and down the template is the basis of the cold die parts, other parts are respectively fixed at the top. Template plane size, especially around the direction to be patible with the workpiece, too large or too small are not conducive to action. Some molds (blanking, punching type mold) to the pieces of convenience, be set up under the mold plate. At this time the best and the template plate connected between the screw, the two plate thickness should be absolutely equal. Plate spacing out the pieces to be able to prevail, not too much, so as not to break the template. 6. Fastening parts which includes screws, nuts, springs, pins, washers, etc., are generally used standard parts. Die more with the amount of standard parts, design choice and flexibility should be tightened to ensure the top out of the need to avoid exposure to the surface fastener operating position, the staff and impede operation to prevent bumps. Die with the development of Since reform and opening, with the rapid development of the national economy, the market demand with the growing Die. In recent years, Die with the industry has been around 15% growth rate of the rapid development of industrial enterprises with ownership Die ponents also changed dramatically, in addition to the professional mold factory outside of stateowned, collective, joint ventures, whollyowned and private has been a rapid development. As with the accelerating pace of international integration, the increasing petition in the market, it has been increasingly recognized product quality, cost, and new product development capacities. The cold die manufacturing is the most basic elements of the chain, one of the cold die manufacturing technology to measure a country39。 s manufacturing sector has bee an important symbol of the level, and largely determine the viability of enterprises. Die with enterprises to increase in recent years many technological advances for investment, technological progress will be seen as an important driving force for enterprise development. Some domestic enterprises have popularized the twodimensional mold CAD, and gradually began to use UG, Pro / Engineer, IDEAS, EuclidIS and other international mon software, individual manufacturers have also introduced Moldflow, CFlow, DYNAFORM, Optris and MAGMASOFT etc. CAE software, and successfully applied in stamping die design. A car cover mold as the representative of a large stamping die manufacturing technology has made great progress, Dongfeng Motor Corporation mold factory, mold manufacturers such as FAW mold center has been able to produce some car cover mold. In addition, many research institutions and universities to carry out technology research and development of mold. After years of effort, in the mold CAD / CAE / CAM technology has made remarkable progress。 in improving quality and reducing mold die design and manufacturing cycle, and so contributed. Although China Die with the industry over the past decade has made remarkable development, but in many ways pared with the industrialized countries there is still a large gap. For example, the precision machining equipment, processing equipment in Die with the relatively low proportion。 CAD / CAE / CAM technology peration is not high。 many advanced mold technology not widely so, resulting in a considerable number of large, sophisticated, plex and long Die life with dependence on imports. With the continuous progress of science and technology, modern industrial production of increasingly plex and diverse, product performance and quality is ever increasing, thus the cold stamping technology put forward higher requirements. In order to adapt to the cold stamping technology industry needs, cold stamping technology itself al。模具毕业设计外文翻译--冷冲模具使用寿命的影响及对策(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。