模具类外文翻译(英文译文---注塑模cae技术-模具设计(编辑修改稿)内容摘要:

in of analysis techniques. Fusion launched in 2020, analysis techniques, enabling users do not need to extract the neutral surface can be analyzed, to overe the reconstruction of the geometric model, thus greatly reducing the burden on the user modeling. Grid is also a triangular element, and its principle is to mold cavity or the products in the thickness direction is divided into two parts, finite element mesh on the surface of the cavity or the products. In the flow process, the upper and lower surface of the plastic melt at the same time two and to coordinate movement of the simulation shown . Clearly, Fusion technology, the surface of the grid is based on the neutral surface is still not solve the fundamental problem the neutral surface, so doublesided application of the principle of streaming technologies and methods applied in the surface flow with no difference in the nature, the The difference is twosided flow using a series of related algorithms, will flow along the surface of the singlestranded melts evolved along the upper and lower surface of the coordination of the flow of dualstream. Doublesided flow of technology39。 s biggest advantage is that the model greatly shorten the preparation time, thus greatly reducing the burden on the user modeling, will take several hours or even days of the original modeling work reduced to a few minutes. Therefore, based on doublesided flow simulation software technology, although the advent of time, only a few years, but in the world but has a huge user base, get the majority of customers for their support and praise. But the doublesided flow of technology has the following deficiencies: (1) The twosided flow of technology does not fundamentally resolve the issue of a neutral face, they still can not describe some threedimensional features, such as the inertial effect can not describe gravity effect on the melt flow, which fail to predict jet phenomenon, melt cuttingedge Quanyong phenomena. (2) the upper and lower surfaces corresponding to the melt flow front there are differences. As the upper and lower surface of the grid can not be one correspondence, but the grid shape, orientation and size can not be pletely symmetrical, so how the upper and lower surfaces corresponding to the difference between the melt flow front control is within the scope permitted by Difficulties in the implementation of doublesided streaming technology. (3) melt is only along the upper and lower surface flows, in the thickness direction is not to make any treatment, lack of realism. 6 Moldflow39。 s 3D analysis techniques These two techniques have overlooked the thickness direction of the physical quantity, only twodimensional simulation, and therefore results are not very precise. Moldflow Corporation39。 s 3D (3D) analysis technology uses a true threedimensional solid model flow analysis techniques, through rigorous theoretical derivation and repeated verification, the inertial effect, nonisothermal flow, taking into account factors such as finite element analysis, the melt thickness direction of the physical quantity changes will no longer be ignored, can be a more prehensive description of the process of filling flow phenomena, so that results of the analysis more realistic conditions, applicable to all plastic products. Its threedimensional grid is from the fournode tetrahedron unit. And using the new 3D stereoscopic display technology, can quickly model clearly shows that internal and external flow field, temperature field, stress field and velocity field such as analysis results. For the abovementioned results of the analysis can also be used such as bit lines or equipotential surface display, so that physical models and external changes in the variables show more clearly the case, Moldfiow also offers animation capabilities, through 3D animation display plastic melt in the changes in the flow cavity, allowing users to more intuitively see the design and manufacturing process may encounter problems. But the 3D technology, meshing demanding, more plex equations to calculate the amount of large, long duration and the putational efficiency is low, not suitable for short development cycle and need to be repeatedly revised by CAE verification injection mold design. Therefore, the current peration rate of the technology is not very high, but it will eventually replace the surface flow of technology and doublesided streaming technology. 7 Development Trend of Injection Molding Inje。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。