材料加工专业外文翻译----材料制备机械设计理论中的新趋势和新问题-机械设计(编辑修改稿)内容摘要:

, determined by velocity , load thermodynamic process , elasticity of operation mechanism ,plasticity of workpiece ,dynamic behaviour of interface sticking sliding and partial hydrodynamic lubrication ,etc ,affect and form friction constraints mechanism peculiar to material processing machine ,because these constraints present strong non linearity。 and under certain circumstances ,the constraints may be destroyed or mismatched instantaneously and thus dynamic instability is resulted in. Thus following problems can be put forward : Mechanism of“ spectre chatter” arose from sticking sliding friction and partial hydrodynamic lubrication in rolling interface , instability condition and mechanism of constraint between smooth surface and rotating body under the circumstance of high speed ,heavy duty and boundary lubrication , Lubrication film absorption mechanism and physical chemistry behaviour 49 of interface of unceasingly regenerative surface ,the relationship between rheological characteristic and machine operation parameters. 3. 3 Multi Body Non Linear Contact Mechanism Under the Condition of Extra High Pressure Field To build the super strength pressure field on large area is one of basic function of material processing machine , and it is also necessary to form by once large size structure element (such as spacecraft , intercontinental vehicles ,car and large scale aeroplane etc) . The ability to build super strong pressure field is one of important feature and the base of independent national defense. Under the circumstance of super strength pressure field ,multi body strong nonhertz contact and non linear friction will be produced ,thus local permanent deformation and degrading of element accuracy may be led. New theory foundation of design of machine with super strength pressure field will be furnished through study of multi body strong non hertz contact mechanism , multi body non linear friction mechanism (such as providing force displacement mixed solving process of three dimension multi body) . 3. 4 Load Distribution Law in Multi Sliding Pair With Structure Bias Load With regard to statically indeterminate structure ,load distribution of constraint point is determined by deformation patibility condition. However ,concerning some plane large size statically indeterminate structure with sliding degree of freedom in third dimension ,load distribution can not be determined by deformation patibility condition. Thus new theory basis will be provided by analyzing of contact behaviour and mechanism of sliding pair (such as creep ,force of friction ,integral deformation patibility condition ,etc) . 3. 5 Coupling Mechanism and Stability of Multi Physical Fields in Material Processing Systems In the wake of system function being more and more diversified , conventional technology limits in material processing machine is being 50 broke through unceasingly ,system structure also bees increasingly plicated ,and system performance bees increasingly multi causal . For example ,any instantaneous state of roller in fast rolling mills is affected by elastic deformation ,plastic flow ,heat transfer process , hydro dynamic lubrication process ,interface physical chemistry molecular state and so on[5 ] . In addition ,electromechanical coupling in。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。