机电一体化设计外文翻译--特种车辆制动系统改进设计(编辑修改稿)内容摘要:
system through its paces on the slick ice of Lake Hornavan near Arjeplog, Sweden. Work is currently under way to adapt the technology to buses and large trucks, to avoid jackknifing, for example. Stability control systems will first appear in mid1995 on some European SClass models and will reach the . market during the 1996 model year (November 1995 introduction). It will be available as a $750 option on Mercedes models with V8 engines, and the following year it will be a $2400 option on sixcylinder $1650 of the latter price is for the traction control system, a prerequisite for stability control. Bosch is not alone in developing such a safety system. ITT Automotive of Auburn Hills, Mich., introduced its Automotive Stability Management System (ASMS) in January at the 1995 North American International Auto Show in Detroit. ASMS is a quantum leap in the evolution of antilock brake systems, bining the best attributes of ABS and traction control into a total vehicle dynamics management system, said Timothy D. Leuliette, ITT Automotive39。 s president and chief executive officer. ASMS monitors what the vehicle controls indicate should be happening, pares that to what is actually happening, then works to pensate for the difference, said Johannes Graber, ASMS program manager at ITT Automotive Europe. ITT39。 s system should begin appearing on vehicles worldwide near the end of the decade, according to Tom Mathues, director of 7 engineering of Brake amp。 Chassis Systems at ITT Automotive North America. Company engineers are now adapting the system to specific car models from six original equipment manufacturers. A lesssophisticated and lesseffective Bosch stability control system already appears on the 1995 750iL and 850Ci V12 models from Munichbased BMW AG. The BMW Dynamic Stability Control (DSC) system uses the same wheelspeed sensors as traction control and standard antilock brake (ABS) systems to recognize conditions that can destabilize a vehicle in curves and corners. To detect such potentially dangerous cornering situations, DSC measures differences in rotational speed between the two front wheels. The DSC system also adds a sensor for steering angle, Utilizes an existing one for vehicle velocity, and introduces its own software control elements in the over allantilockbrake/tractioncontrol/stabilitycontrol system. The new Bosch and ITT Automotive stability control systems benefit from advanced technology developed for the aerospace industry. Just as in a supersonic fighter, the automotive stability control units use a sensorbased puter system to mediate between the human controller and the environment in this case, the interface between tire and road. In addition, the system is built around a gyroscopelike sensor design used for missile guidance. BEYOND ABS AND TRACTION CONTROL Stability control is the logical extension of ABS and traction control, according to a Society of Automotive Engineers paper written by van Zanten and Bosch colleagues Rainer Erhardt and Georg Pfaff. Whereas ABS intervenes when wheel lock is imminent during braking, and traction control prevents wheel slippage when accelerating, stability control operates independently of the driver39。 s actions even when the car is freerolling. Depending on the particular driving situation, the system may activate an individual wheel brake or any bination of the four and adjust engine torque, stabilizing the car and severely reducing the danger of an uncontrolled skid. The new systems control the motion not only during full braking but also during partial braking, coasting, acceleration, and engine drag on the driven wheels, circumstances well beyond what ABS and traction control can handle. The idea behind the three active safety systems is the same: One wheel locking or slipping significantly decreases directional stability or makes steering a vehicle more difficult. If a car must brake on a lowfriction surface, locking its wheels should be avoided to maintain stability and steerability. 8 Whereas ABS and traction control prevent undesired longitudinal slip, stability control reduces loss of lateral stabili。机电一体化设计外文翻译--特种车辆制动系统改进设计(编辑修改稿)
相关推荐
电子商务时代电子商务时代批发业务 11/4/2016 中国金融学院电子商务研究所 1金融服务与电子商务时代的批发业务中国金融学院电子商务研究所 陈进11/4/2016 中国金融学院电子商务研究所 2电子商务 电子商务: 通过公共计算机网络进行商务活动的现代方式,该方式将突破传统商务在时间、地域上的限制,成为方便、快捷、安全可靠的新兴电子化活动模式。 电子商务内容: 数字化生活内容,网上商场购物
寿命不利。 所以选用二极管时,应考虑它能承受最大冲击电流的情况。 一般选管子时,要求它承受的正向电流的能力应大于平均输出电流的 2~3 倍。 电容滤波电路简单,制作方便。 但是它的输出电流不宜太大,而且要求输出电压的脉动 成分较小时,必须增加电容器的容量,因此电路的体积大也不经济。 为此,RCπ型滤波电路在实际电路中经常使用。 RCπ型滤波电路如图 26 所示:
quite difficult. Therefore has developed the axial symmetry thrust force vector Corporation starts the axial symmetry thrust force vector nozzledevelopment in the 1980s intermediate stages, its
凯美瑞来说,混合动力版车型的保养情况与普通汽油版车型基本相同,不同之处就在于电池的维修费用昂贵,但厂家往往对电池给出更长的质保期,如 5年 20万公里或者 6年 15万公里的质保期,在此期间,如果电池出现问题,厂家将为该车保修或更换全新的电池。 (八) 可选择车型少 目前汽车企业当中,丰田是最先大力发展混合动力技术的企业,在售的混动车型有凯美瑞、普锐斯以及雷克萨斯 CT200h。 自主品牌方面
M9E Nintendo DS, Nokia NGageConexant chips; STMicroSTR91xF, ARM11 Nokia N93, Zune, Nokia N800, NOKIA E72Cortex Texas Instruments OMAP3; Broad is a user; Luminary Micro[3] 微控制器家族。 基于 ARM 的智能控制最小系统 4
相应的软件有机地结合在一起,构成一个内部匹配合理、外部效能最佳的完整产品。 11 第 3 章 机电一体化技术的发展趋势 机电一体化技术是面向应用的跨学科的技术,它是机械技术、微 电子 技术、信息技术和控制技术等有机融合、相互渗透的结果。 今天机电一体化技术发展飞速,机电一体化产品更新日新月异。 机电一体化技术的发展历程 “ 机电一体 化 ” 这个词是日本安川电机公司在上世纪 60