软件编程设计-外文翻译(编辑修改稿)内容摘要:
e structure, behavior which describes numerical system, function with addition to implying many languages sentence which have a hardware characteristic, VHDL languages forms and description style and sentence construction are very similar at general calculator deluxe procedure structure characteristics is an engineering design, or call that the design entity(can be a ponent, an electric circuit mold piece or a system) is divided into exterior(or call but part, and port) with inner part(or call to can39。 t see part), since involve internal function and calculate way of entity to plete part to 1 designed entity to define exterior interface after, once it internal development pletion after, other designs can directly adjust to use this kind of will design entity to be divided into a little bit basic VHDL system that is a VHDL system inside the concept of outside part design design of a little bit basic and other hardware describe the language pare and the VHDL has a following characteristics: The function is strong and the design be VHDL has the function strong language structure, can describe a plicated logic control with the simple and direct and explicit source has a multilayer design description function, in multiple layers thin turn, finally directly born electric circuit class VHDL supports synchronous electric circuit, difference39。 s tread electric circuit with random the design of electric circuit, this be the other hardware description although the language can39。 t pare VHDL still supports various design method, since support from the bottom upward design, support again from the design of crest declivity。 Since the support mold piece turns a design, support layer39。 s turn a design again. Support extensively and be easy to a the VHDL has already bee IEEE standard the norm of hardware description language, most EDA tools almost support VHDL currently, this is VHDL of further expansion with extensively applied lay the design process of the hardware electric circuit, the main design document is the source code which writes with the VHDL, the VHDL easily reads with the structure turn, so be easy to a modification design. The strong system hardware describes VHDL has a multilayer design description function, since can describe system class electric circuit, can describe door class electric circuit description since can adopt a behavior description, deposit a machine to deliver description or structure description, can also adopt the hybrid description of threes , VHDL support is inertial to delay and deliver to delay, can also accurately build up hardware electric circuit support prepare definite of with from definition of data type, bring hardware description a bigger freedom degree, make design the personnel can expediently establish the system model of high time. The independence is at the design of spare part, have nothing to do with the 39。 t need to consider a choice pletion the spare part of design first while designing a personnel to carry。软件编程设计-外文翻译(编辑修改稿)
相关推荐
ddition, it increased the degree of paction of the embankment base of not less than 93% of the requirement. With the rapid development of highway roadbed construction technology has also made
,b34,b35,b36,b37,b38,b39,b40,b41,b42,b43,b44,b45,b46,b47,b48,b49,b50,b51,b52,b53,b54,b55,b56,b57,b58。 // 定义变量 public static void main(String args[]){ ruanjianpan s=new ruanjianpan()。 ()。 } public
1 1. 绪论 设计的 目的 与意义 随着我国农业的不断发展,我国对农村的问题越来越关注, 农业是国民经济的基础 , 这是不以人们意 志为转移的客观经济规律。 农业生产力发展的水平和农业劳动生产率的高低 , 决定了农业为其他部门提供剩余产品和劳动力的数量 , 进而制约着这些部门的发展规模和速度。 只有农业发展了 , 国民经济其他部门才能得以进一步的发展。 而农业机械化是农业现代化的中心环节 ,
金融投资担保公司商业计划书(ppt31 商业计划书中元籴焜金融投资担保公司2006年 1月2006一、公司简介 公司概况:青岛中元籴焜金融投资担保有限公司于 2005年 7月 8日成立,公司注册资本 5000万元人民币,现由四位自然人股东共同投资,是一家完全按照商业化规范运作的专业金融投资担保公司。 经营模式:中元籴焜采用担保及延伸业务的经营模式。 公司在致力于做大做强企业担保业务的基础上
sign decisions affected by this refinement) to be part of the physical design process. Where we draw the line between design and tuning is not very important. OVERVIEW OF DATABASE TUNING After the
lution how do you get an object to do useful work for you? There must be a way to make a request of the object so that it will do something, such as plete a transaction, draw something on the screen,