车辆工程专业毕业设计外文翻译---自动变速器如何工作(编辑修改稿)内容摘要:

marize the gear ratios, inputs and outputs: Gear Input Output Fixed Gear Ratio 1st 30tooth sun 72tooth ring Pla carrier :1 2nd 30tooth sun Pla carrier 36tooth ring :1 外文资料 8 Pla carrier 72tooth ring 36tooth sun :1 Total 2nd :1 3rd 30 and 36tooth suns 72tooth ring :1 OD Pla carrier 72tooth ring 36tooth sun :1 Reverse 36tooth sun 72tooth ring Pla carrier :1 Hydraulic System The automatic transmission in your car has to do numerous tasks. You may not realize how many different ways it operates. For instance, here are some of the features of an automatic transmission:  If the car is in overdrive (on a fourspeed transmission), the transmission will automatically select the gear based on vehicle speed and throttle pedal position.  If you accelerate gently, shifts will occur at lower speeds than if you accelerate at full throttle.  If you floor the gas pedal, the transmission will downshift to the next lower gear.  If you move the shift selector to a lower gear, the transmission will downshift unless the car is going too fast for that gear. If the car is going too fast, it will wait until the car slows down and then downshift.  If you put the transmission in second gear, it will never downshift or up shift out of second, even from a plete stop, unless you move the shift lever.  You39。 ve probably seen something that looks like this before. It is really the brain of the automatic transmission, managing all of these functions and more. The passageways you can see route fluid to all the different ponents in the transmission. Passageways molded into the metal are an efficient way to route fluid。 without them, many hoses would be needed to connect the various parts of the transmission. First, we39。 ll discuss the key ponents of the hydraulic system。 then we39。 ll see how they work together. The Pump Automatic transmissions have a neat pump, called a gear pump. The pump is usually located in the cover of the transmission. It draws fluid from a sump in the bottom of the transmission and feeds it to the hydraulic system. It also feeds the transmission cooler and the torque converter. 外文资料 9 The inner gear of the pump hooks up to the housing of the torque converter, so it spins at the same speed as the engine. The outer gear is turned by the inner gear, and as the gears rotate, fluid is drawn up from the sump on one side of the crescent and forced out into the hydraulic system on the other side. The Governor The governor is a clever valve that tells the transmission how fast the car is going. It is connected to the output, so the faster the car moves, the faster the governor spins. Inside the governor is a springloaded valve that opens in proportion to how fast the governor is spinning the faster the governor spins, the more the valve opens. Fluid from the pump is fed to the governor through the output shaft. The faster the car goes, the more the governor valve opens and the higher the pressure of the fluid it lets through. Valves and Modulators Throttle Valve or Modulator To shift properly, the automatic transmission has to know how hard the engine is working. There are two different ways that this is done. Some cars have a simple cable linkage connected to a throttle valve in the transmission. The further the gas pedal is pressed, the more pressure is put on the throttle valve. Other cars use a vacuum modulator to apply pressure to the throttle valve. The modulator senses the manifold pressure, which drop。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。