车床毕业论文外文翻译(编辑修改稿)内容摘要:
Tool features have been identified by many names. The technical literature is full of confusing terminology. Thus in the attempt to clear up existing disorganized conceptions and nomenclature, the American Society of Mechanical Engineers published ASA Standard B5221950. what follows is based on it. A singlepoint tool is a cutting tool having one face and one continuous cutting edge. Tool angles identified in Fig. 142 are as follows: (1) Backrake angle, (2) Siderake angle, (3) Endrelief angle (4) Endrelief angle (5) Siderelief angle (6) Endcuttingedge angle, (7) Sidecuttingedge angle, (8) Nose angle, (9) Nose radius. Tool angle 1, on front view, is the backrake angle. It is the angle between the tool face and a line parallel to the base of the shank in a longitudinal plane perpendicular to the tool base. Then this angle is downward from front to rear of the cutting edge, the rake id positive。 when upward from front to back, the rake is negative. This angle is most significant in the machining process, because it directly affects the cutting force, finish, and tool life. The siderake angle, numbered 2, measures the slope of the face in a cross plane perpendicular to the tool base. It, also, is an important angle, because it directs chip flow to the side of the tool post and permits the tool to feed more easily into the work. The endrelief angle is measured between a line perpendicular to the base and the end flank immediately below the end cutting edge。 it is numbered 3 in the figure. It provides clearance between work and tool so that its cut surface can flow by with minimum rubbing against the tool. To save time, a portion of the end flank of the tool may sometimes be left unground, having been previously forged to size. In such case, this endclearance angle, numbered 4, measured to the end flank surface below the ground portion, would be larger than the relief angle. Often the end cutting edge is oblique to the flank. The relief angle is then best measured in a plane normal to the end cutting edge perpendicular to the base of the tool. This clearance permits the tool to advance more smoothly into the work. The siderelief angle, indicated as 5, is measured between the side flank, just below the cutting edge, and a line through the cutting edge perpendicular to the base of the tool. This clearance permits the tool to advance more smoothly into the work. Angle 6 is the endcuttingedge angle measured between the end cutting edge and a line perpendicular to the side of the tool shank. This angle prevents rubbing of the cut surface and permits longer tool life. The sidecuttingedge angle, numbered 7, is the angle between the side cutting edge and the side of the tool shank. The true length of cut is along this edge. Thus the angle determines the distribution of the cutting force. The greater the angle, the longer the tool life。 but the possibility of chatter increases. A promise must, as usual, be reached. The nose angle, number 8, is the angle between the two ponent cutting edges. If the corner is rounded off, the arc size is defined by the nose radius 9. the radius size influences finish and chatter. Cutting Tool Materials A large number of cutting tool materials have been developed to meet the demands of high metalremoval rates. The most important of these materials and their influence on cutter design, are described below. High Carbon Steel. Historically, high carbon steel was the earliest cutting material used industrially, but it has now been almost entirely superseded since it starts to temper at about 220℃ and this irreversible softening process continues as temperature increases. Cutting speeds with carbon steel tools are therefore limited to about (30ft/min) when cutting mild steel, and even at these speeds a copious supply of coolant is required. Highspeed Steel. To overe the low cutting speed restriction imposed by plain carbon steels, a range of alloy steels, known as highspeed steels, began to be introduced during the early years of this century. The chemical position of these steels varies greatly, but they basically contain about % carbon and 4% chromium, with addition of tungsten, vanadium, molybdenum and cobalt in varying percentages. They maintain their hardness at temperatures up to about 600℃ , but soften rapidly at cutting speeds in excess of (350ft/min), and many cannot successfully cut mild steel faster than (150ft/min). Sintered Carbides. Carbide cutting tools, which were developed in Germany in。车床毕业论文外文翻译(编辑修改稿)
相关推荐
情况 , 而是在报不报 、如何报上费心思 、 做文章 , 生怕影响自己。 有的明明是责任事故 , 却 “ 破财免灾 ”, 花巨资把责任推向地方。 有的明明一起事故死了 3 个人 , 却先上报两死一伤 , 过一段时间再补报 ,想方设法逃避通报。 有一个单位发生了车辆事故 , 明明是翻车 , 却编报为侧转九十度。 三是对事故处理不实。 有些单位对发生的问题 , 缺乏具体情况具体分析。 有的隐情不报
achined when the material must be fed through spindle. The tailsticd assembly consists, essentially, of three parts. A lower casting fits on the inner ways of the bed and can slide longitudinally
酒业整合营销方案(食品行业商业计划书模板) 第 1页 共 106页舍得 08年整合营销方案杰信营销 咨询有限公司第 2页 共 106页目录 前觍 从产品开始的品牉乀路 市场定位 建立品牉 营销计划 整合传播第 3页 共 106页前言 通过半东市场卉年多的品牉运作,市场和各斱的反应证明我们对舍得品牉运作的戓略思路是正确的。 2008年将是关键的一年,竞争对手丌会对我们坐视丌理。
用 ActiveX 技术允许用户使用其它的应用程序提供的功能,如Microsoft Word、 Microsoft Excel,甚至可直接使用由 Visual Basic 专业版和企业版创建的应用程序和对象。 Visual Basic 的 Inter 功能允许用户通过程序方便的通过Inter 或 Intra 访问文档和应用程序,甚至创建 Inter 服务器程序。 用户最
器一次性装夹完成全部工作的组装,不仅翻转和压配实现了自动化,而且还降低了劳动强度,节约了人力资源,提高了装配效率。 随着客户的需求,安叉集团公司生产的装载机产量在不断的增加,然而,在装配过程中,装载机离合器的轴承和波形弹簧压装较为困难,翻转也较为吃力、麻烦,现有装配台架已经不能满足生产需求。 为了解决这一 “ 瓶颈 ” ,提高生产效率,减少工人劳动强度,直属一金工车间和工艺科联 合商讨制定
工序的说明 CA6140 拔叉零件 的重要加工面有花键底孔、两端面,花键,槽,顶面,材料为 HT200,参考《机械制造工艺设计简明手册》,其加工方法选择如下: 加工 前后 两端面 根据 GB180079 规定毛坯的公差等级为 IT13,表面粗糙度为 m,要达到后 端面 m 的技术要求,需要经过粗铣→精铣。 加工 Φ 22 花键底孔 此工序重点在于找正毛坯对称面,故采用螺旋定心夹紧机构,找正对称面