车床与铣削加工外文翻译(编辑修改稿)内容摘要:
stock can be fed through it. The size of this hole is an important size dimension of a lathe because it determines the maximum size of bar stock that can be machined when the material must be fed through the spinale. The inner end of the spindle protrudes from the gear box and contains a means for mounting various types of chucks, face plates, and dog plates on it. Whereas small lathes often employ a threaded section to which the chucks are screwed, most large lathes utilize either camlock or keydrive taper noses. These provide a largediameter taper that assures the accurate alignment of the chuck, and a mechanism that permits the chuck or face plate to be locked or unlocked in position without the necessity of having to rotate these heavy attachments. Power is supplied to the spindle by means of an electric motor through a Vbelt or silentchain drive. Most modem lathes have motors of from 5 to15 horsepower to provide adequate power for carbide and ceramic tools at their high cutting tailstock assembly consists, essentially, of three parts. A lower casting fits on the inner ways of the bed and can slide longitudinally thereon, with a means for clamping the entire assembly in any desired location. An upper casting fits on the lower one and can be moved transversely upon it on some type of keyed ways. This transverse motion pemfits aligning the tailstock and headstock spindles and provides a method of tuming tapers. The third major ponent of the assembly is the tailstock quill. This is a hollow steel cylinder, usually about 2 to sinches in diameter, that can be moved several inches longitudinally in and out of the upper casting by means of a handwheel and screw. The open end of the quill hole terminates in a morse. Taper in which a lathe center, or various tools such as drills, can be held. A graduated scale, several inches in length, usually is engraved on the outside of the quill to aid in controlling its motion in and out of the upper casting. A locking device permits clamping the quill in any desired position. The carriage assembly provides the means for mounting and moving cutting tools. The carriage is a reianvely fiat Hshaped casting that rests and moves on the outer set of ways on the bed. The transverse bar of the carriage contains ways on which the cross slide is mounted and can be moved by means of a feed screw that is controlled by a small handwheel and a graduated dial. Through the cross slide a means is provided for moving the lathe tool in the direction normal to the axis of rotation of the most lathes the tool post actually is mounted on a pound rest. This consists of a base, which is mounted on the cross slide so that it can be pivoted about a vertical axis, and an .upper casting. The upper casting is mounted on ways on this base .so that it can be moved back and forth and controlled by means of a short lead screw operated by a handwheel and a calibrated dial. Manual and powered motion for the carriage, and powered motion for the cross slide, is provided by mechanisms within the apron,attached to the front of the carriage. Manual movement of the carriage along the bed is effected by turning a handwheel on the front of the apron, which is geared to a pinion on the back side. This pinion engages a rack that is attached beneath the upper front edge of the bed in an inverted position. MILLING Milling is a basic machining process in which the surface is generated by the progressive formation and removal of chips of material from the wo。车床与铣削加工外文翻译(编辑修改稿)
相关推荐
工序的说明 CA6140 拔叉零件 的重要加工面有花键底孔、两端面,花键,槽,顶面,材料为 HT200,参考《机械制造工艺设计简明手册》,其加工方法选择如下: 加工 前后 两端面 根据 GB180079 规定毛坯的公差等级为 IT13,表面粗糙度为 m,要达到后 端面 m 的技术要求,需要经过粗铣→精铣。 加工 Φ 22 花键底孔 此工序重点在于找正毛坯对称面,故采用螺旋定心夹紧机构,找正对称面
器一次性装夹完成全部工作的组装,不仅翻转和压配实现了自动化,而且还降低了劳动强度,节约了人力资源,提高了装配效率。 随着客户的需求,安叉集团公司生产的装载机产量在不断的增加,然而,在装配过程中,装载机离合器的轴承和波形弹簧压装较为困难,翻转也较为吃力、麻烦,现有装配台架已经不能满足生产需求。 为了解决这一 “ 瓶颈 ” ,提高生产效率,减少工人劳动强度,直属一金工车间和工艺科联 合商讨制定
用 ActiveX 技术允许用户使用其它的应用程序提供的功能,如Microsoft Word、 Microsoft Excel,甚至可直接使用由 Visual Basic 专业版和企业版创建的应用程序和对象。 Visual Basic 的 Inter 功能允许用户通过程序方便的通过Inter 或 Intra 访问文档和应用程序,甚至创建 Inter 服务器程序。 用户最
开便利店计划书 便利店创业计划书一、便利店的潜力及趋势近年来,由于大型卖场的数量不断增加,中小型卖场由于在商品品种以及经营项目、经营理念的落后,加上经营成本居高不下,导致生存空间越来越小,从而引发了业态的变革,从而产生了居于超市和小型杂货铺另外一种业态便利店。 便利店主要是为方便周围的居民或是人群而开设的一种小型超市,是生存于大型综合卖场及购物中心的商圈市场边缘的零售业态。
酒店式湖景别墅商业计划书) 目 录前 言 .执行概要 .目概述 .目发起人简介 .东单位 .目提供的产品和服务 .目的创意和定位 .)项目创意 .)项目定位 .目优势 .)地理位置优越,交通便利 .)具有较大的市场空间和目标客户群体 .)与园区内多个项目形成资源共享及优势互补 .)创新的“大型人工湖旅游酒店式别墅”经营模式 .目规划及建设方案 .)项目地址 .)酒店式湖景别墅规划设计