路桥毕业设计外文翻译--浅析公路路基边坡防护-公路隧道(编辑修改稿)内容摘要:

he landslide is refers to the part of the gravity of soil slope under one of the sliding surface sliding, mainly because of the soil slope of embankment caused by inadequate stability of landslide is the main reason of the side slope steep or spend change clearly feet are hollow, or filling levels arrangement inappropriate, etc.。 Cut slope is the main reason of the landslide slope height and slope and natural geotechnical levels of nature does not adapt spalling and broken down is refers to the slope rock weathering surface. In different kinds of external environment under the influence of the top rock slope and peeling off from the destroy form of collapse usually refers to the larger stones out along the slope surface slope and tumble down. second , Embankment slope protection design principles Highway slope distribution along the road of the range, the destruction of the environment of natural range, if in the protection, and can also pay attention to protect the environment and create the environment, the adoption of appropriate green protective method, can make highway has safe and fortable and beautiful in harmony with the environment and other characteristics, which will create considerable economic benefit and social benefit of ecological benefit so, slope design should follow the safety of soil and water conservation and restoration of natural green environmental protection of the way the design principles thirdly, embankment slope protection method plant grass protection plant protection in the slope is planted on grass or trees to slow down the slope of flow velocity, the use of plant root consolidation of surface soil slope to reduce erosion, so as to achieve the function of the slope protection plant protection not only can beautification highway environment, adjust the temperature wet slope, consolidation and the stability of the slope play a role, and simple economic. Plant grass protection should choose the root system developed stem short and leafy drought tolerant grass seed, it is strictly prohibited to the growth in mud to clear the implanted directly into the grass slope protection method are as follows: firstly, in the soil slope surface water mixing with seed fertilizer, direct sprayed in the slope surface, the advantage is simple convenient construction cost is low, but vulnerable to wind erosion。 Secondly, in dressing good slope surface, will clay fertilizer water with seed mixture of spray directly injection machine in the slope, and the soil adhesion, seed will rooted in soil slope, forming over。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。