计算机科学与技术外文翻译--未来的数据采集:“云计算”将替代传统数据记录仪?(编辑修改稿)内容摘要:
software program (known as embedded firmware) is stored on the data logger that controls the logger’s processes – some of which are defined by the user, such as the logging intervals from connected sensors. The data logger also has a data storage device similar to a puter, using FLASH memory to store files. This set of hardware and software work in tandem to collect and store data, control other instruments, and transmit data if the logger is connected to a telemetry radio device. A typical data acquisition application includes sensors connected or integrated with a data logging instrument at each physical location (See Figure 1). A telemetry modem (radio) is often connected to the data logger for wireless munication of the sensor data to a central office location. The central office location municates with the data logger from the remote locations using a data management software program. Inter access is typically provided from a separate customized program that integrates with the data management software program. 4 Figure 1. Flow of Data in a traditional example data acquisition system Today, a revolutionary change for data acquisition applications is available for those data collection sites that have Inter access (See Figure 2). The need for a localized data logging instrument and separate centralized data management software program is no longer required. Figure 2. Flow of data using the concept of cloud puting Instead, the user simply integrates the sensors directly to an IP (Inter Protocol) addressable telemetry modem for direct connectivity to the Inter program. The Inter software program placed on a remote server is programmed to municate directly with the remote modem and pull each sensor’s data. Data buffers can be included in the IP addressable modem for missed connections with the Inter Server. This works well with serial addressed digital sensors (such as RS485 or SDI12), but is more involved with analog sensors. This revolutionary trend will also increase the demand for new smart sensors and for smart mobile phone applications for remote configuration and programming of sensors. The software program residing on the Inter cloud functions as a virtual data logger and can be programmed to execute multiple userdefined routines and utilize other web services for enhanced data analysis, reporting, notifications and control not possible with a typical data logging instrument. 5 Figure 3. An overview of how data from remote monitoring stations can be accessed from any puter or mobile device with access to the inter, by taking advantage of a virtual logging platform hosted on the cloud. Cloudbased data collection and di。计算机科学与技术外文翻译--未来的数据采集:“云计算”将替代传统数据记录仪?(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。