计算机专业毕业设计外文文献及译文--一般接入互联网在windowsxp中做的调整-管理系统(编辑修改稿)内容摘要:

it is not selected yet) and push the button APPRX. The remark. It is possible to assign also a unique static IP address in a range from to . For example, assignment of the following bination of a static IP address, a sub and gateway mask by default is possible: IP address Sub mask: The gateway by default: 8. In a dialog box Connection on a local work — properties push the button APPRX. 9. Close a control bar. To adjust the client puter for usage of the general connection to the Inter, fulfill specified below action. 山东建筑大学毕业设计(或毕业论文,二选一)外文文献及译文 3 1. Push the button Startup and select point the control bar. 2. Click point the work and connections to the Inter. 3. Push the button Inter Parameters. 4. In a dialog box of Property of an observer open the connection tab. 5. Push the button to install. The master of new connection will be launched. 6. On page the Master of new connections push the button Further. 7. Select a variant to connect to the Inter and push the button Further. 8. Select a variant to Install connection manually and push the button Further. 9. Select parameter to be connected through constant high speed connection and push the button Further. 10. On page End of operation of the master of new connections push the button It is ready. 11. Close a control bar. Now at start of observer Inter Explorer the client puter will try to be connected to the Inter through the general connection of the puter host. Debugging At switchingon of the general access to Inter connection on the puter host to a work board for a local work the IP address。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。