百科全书
在线不列颠百科全书(ppt91)-经营管理(编辑修改稿)
icles) 111112 第二章 能量,放射和物质的状态与转化 (The Energy, radiation, and the states and transformatio of matter ) 121128 第三章 宇宙: 银河、恒星和太阳系 (The Universe:galaxies, stars, the solar system) 131133 第一部分的说明 物理学、化学
语法百科全书(编辑修改稿)
town at all? No, this is the first time I ___ here. A. was B. have been C. came D. am ing 答案 B. This is the first time 后面所加从句应为现在完成时,故选 B。 (2) Have you ____ been to our town before? No, it39。 s the