bs
al installation in ducts, trunking, suspended floors and ceiling cavities building backbone cable cable suitable for connecting a building distributor to a floor distributor and may also connect
............................................................................................... 54 Section 5 Fill, dewatering, ground improvement and reinforcement.............................. 55
ed. This sectional specification is to be read in conjunction with EN 502881, which contains the essential provisions for its application. Cables covered by this specification have maximum rated
t methods, are detailed. This sectional specification is to be read in conjunction with EN 502881, which contains the essential provisions for its application. 2 Normative references This European
its ability to match the particular application requirements. Documentation The manufacturer or supplier of the lightning strike counter shall provide adequate information in his literature to ensure
学院 系统的易用性和易维护性 售票系统是直接面对普通用户的,而大多普通用户往往对计算机并不是非常熟悉。 这就要求系统能够提供良好的用户界面。 要实现这一点,就要求系统应该尽量使用用户熟悉的术语和中文信息界面;针对用户在使用中出现的错误操作,尽量给出中文提示。 售票系统中涉及到的数据是铁路部门的相当重要的信息,系统应提供方便的手段供系统维护人员进行数据的备份,日常的安全管理
表 T_HRMS_PXXX 培训信息表 T_HRMS_HT 合同表 T_HRMS_XS 薪水表 T_HRMS_YPRYXX 应聘人员信息表 T_HRMS_MSXX 面试信息表 数据表逻辑结构 用户 表 T_HRMS_YH,如表 2 所示。 该表记录用户信息,其中编号 N_BH 为主键,用户账号 C_ZH 为外键,关联员工信息表 T_HRMS_YGXX 中的员工标识 C_BS 字段。 表 2
系统需求分析 .................................................................................................... 11 当前现状与系统总体需求分析 ........................................................................
管理员可以根据 领导的指示,对员工的上下班时间进行设定,以方便考勤。 请假管理 管理员可以根据员工请假的情况,如开始日期、结束日期、开始时间、结束时间进行登记,并可以对员工的请假情况进行查询及删除操作。 出差管理 管理员可以根据员工出差的情况,如开始日期、结束日期、开始时间、结束时间进行登记,并可以对员工的出差情况进行查询及删除操作。 考勤管理 1. 出勤(签到) 员工到岗时
usion, iCAT, Tango 与自行发展的应用软体。 当您正使用 Dreamweaver 在设计动态网页时,所见即所得的功能,让您不需要透过浏览器就能预览网页。 梦幻样版和 XML Dreamweaver 将内容与设计分开,应用于快速网页更新和团队合作网页编辑。 建立网页外观的样版,指定可编辑或不可编辑的部份,内容提供者可直接编辑以样式为主的内容却不会不小心改变既定之样式。