补码
4041 CMOS 四原码-补码缓冲器
(is as a by 50% 0 V (TL 0 1 2. S. )to 00 00 (10 260)30)V 1 30 0V 2 60 5V 4 120 V, V 0V 5V V, V 0V 0 5V 5 V, 0V, V V 5V, V, 0V, V V 5V, V, .2 ) 0V, 0 3.5 5V, 4 12 24 8 V, ) 0V, .4 5V, .0 V, ) 0V, b4
4561 CMOS “9”补码电路
0067s is a to to CD A 8421 to 20, 21, 22, 23). If is CD at to be or an to be If is s of is at Z), of is to CD in dc 8 ( 0.5 DC 0.5 DC 10 500 65 150 8260 to P ” 7.0 0095C 5o 125L” 12 0095C 00o 1251 3