burg
基于burg算法的谱估计研究及其matlab实现毕业设计论文(编辑修改稿)
ock frequency approximately m times higher and a munication bottleneck with the divider. The clockrate of the divider can be increased to a similar maximum rate as the multiplier by pipelining the