醋酸
醋酸生产外文翻译(编辑修改稿)
y regulator. The global demand of acetic acid is around million tonnes per year (Mt/a), of which approximately Mt/a is met by recycling。 the remainder is manufactured from petrochemical feedstocks or
20xx年年产5000吨食用醋酸项目验收报告正文(编辑修改稿)
公厕后定期清运。 项目水平衡图详见图3。 图3项目水平衡图单位:m3/d序号设备名称环评及批复情况实际建设情况与环评及批复的一致性规格/型号数量规格/型号数量1蒸馏冷凝系统16kg/h 40组640kg/h 1套生产能力一致2原料储罐200m 3 1个200m 3 1个一致3高位罐2m 3 1个2m 3 1个一致4成品储罐5m 3 1个5m 3 1个一致5分装罐9m3 1个9m 3 3 3