德马格
length 700 m 钢绳长度 700 米 Perm. line pull 151 KN 单绳允许拉力 151 千牛 Line speed 75 m/ min 单绳速度 75 米 /分 Boom derricking system HE, with rope and rotation indicator 大臂变幅卷扬,带钢绳和卷扬指示器 Rope diameter: 32 mm 钢绳直径
troke to achieve 9598% fill Take sixteeen consecutive mouldings and determine the standard deviation of the weights. Print out: Page 21 Dosing Profiles Page 50 Process Statistics What has happened to
ircuit switch vacuum pump 1/4 (vacuum lifter) deenergised 吸盘上的真空泵没有电,检查真空泵的电源开关 Crane: F121 1 CRD overtemperature vacuum pump 1 真空泵电机过温 Crane: F125 1 CRD vaccum lifer .door cubicle is open 检查吸盘上配电柜的门
duty factor either cannot be specified or the specified duty factor can be exceeded in individual cases. If the cyclic duty factor is known (regenerative operation ? motor operation / break), an
, smaller reflective tape normally suffices. To avoid highly reflective surfaces (e. g. shelves or other surfaces) to mirror in light beams or scattered light, align the reflector in the „free space“