draft
is be to or 003is be to or n as in of we a of on to a to to of of of is on it of to it is We no or to to it is be or in or in to or do to ao of 86 10 is be to or : I : of ey : ey of : of s in ey on
is be to or 002is be to or : : ey : he of he of : of of : of : of : is be to or : is be to or is be to or 000 2001 2002 2003 2004 2005H F C 1 3 4 a H C F C 2 275,893142,7576,047 11,833is be to or 000
is be to or 002is be to or : : ey : he of he of : of of : of : of : is be to or : is be to or is be to or 000 2001 2002 2003 2004 2005H F C 1 3 4 a H C F C 2 275,893142,7576,047 11,833is be to or 000
is be to or 003is be to or n as in of we a of on to a to to of of of is on it of to it is We no or to to it is be or in or in to or do to ao of 86 10 is be to or : I : of ey : ey of : of s in ey I:
is be to or 002is be to or n as in of 2 2002 (), we a of in a to a a to of is on it of to it is We no or to to it is be or in or in to or do to of 86 21 is be to or on we to to be be s be by in in we
2001I: 19V: 047I: s 981. It up a 992 998 a in a by It 00 in In is In s to be of As. s I: 2000 a in to s 002 of ens a of x s 1996 of of A de o., of A of s 1988 of on of o., , a of a of on s on i s on
试治具的合适的配件。 制造商应向已被认可的、独立的测试实验室提交所有的相关产品以确保产品符合条款 6。 根据 ISO/IEC 17025标准所 列的(已 标明包 含本标准的明确的范围)要求, 测试实验室 须通过鉴定。 拉力测试 必须进行拉力测试以确定锁具锁定机构的强度。 测试治具 以某种方式给锁具施加一均布载荷并模拟与锁定锁具方向的相反的运动。 载荷必须缓慢施加,直至锁具被强迫打开或破坏。