翻译
ectricity” the time, namely the electrical time, the Electronic Age and already entered puter time. However, this kind of puter, usually refers to the personal puter, is called PC machine. It by the
oad mass. The inertia and the mass are linked by a spring. Friction present in the motor bearings, the gearbox, the beltdrive, and nonmodelled higherorder dynamics are considered as an unknown
In the manpower unloads the oil extraction rod thread efficiency in view of the rework operation in lowly, the labor intensity is big, also cannot guarantee the different specification oil extraction
LiA is the projector distance between ith node and node A. Ultimately, h is the maximum of the absolute value of Wi: 5 In industry, the inspection of the warpage is carried out with the help of a
shape of the curves, they are also sometimes called Ccurves or Scurves. To plot TIT curves, the particular steel is held at a given temperature and the structure is examined at predetermined
所示)。 鉴于从第一代 卡尔斯鲁厄灵巧 手设计中得到的经验,比如 因 传动带而导致的 机械问题以及较大摩擦因数导致的控制问题, 卡尔斯鲁厄灵巧手Ⅱ 采用了一些不同的设计决策。 每根手指的关节 2 和关节 3 之间的直流电机被整合到手指 前部肢体中(图 5 所示)。 这种布置可使用很硬的球轴齿轮将运动传递到手指的关节处。 处在电机轴上的角度编码器(在齿轮前)此时可作为一个精度很高的位置状态传感器。
people have addressed some special cases which were not addressed by the original publication [3], such as reflecting (metallic) media [5], nonsymmetric threelayer interferometry [6], and most
of A356, the precipitates are Mg2Si. In order to prevent the Mg2Si particulates from again precipitating out of solution, a rapid quench is employed. Quenching the castings also insures that the
用兵的规律好像水的流动,水的流动,是由于避开高处而流向低处;用兵的规律是避开实处而攻击虚处。 水流是根据地形来走流向,用兵是根据情况来采取致胜方略。 所以,战争无固定不变的态势,流水无固定不变的流向。 能够根据敌情发展变化而采取灵活的措施取胜的人,才叫做用兵如神。 五行相生相克没有哪一个固定常胜的,四时没有不更替的,白天有短有长,月亮也有晦有朔。 【 军争第七 】 孙子曰:凡用兵之法,将受命于君
deallocating memory and hunting for memory leaks. This is no small feature, since hunting for memory leaks can be difficult and timeconsuming. Interoperability The .NET Framework was designed for