高中英语
ks. • My name is Li Kang. I live in Shijiazhuang, a city ___ ___ ____ Beijing. It is the capital city of Hebei _________. Today is my first day at Senior High school and I’m ______ _____ my thoughts
Listen to the tape and fill in the blanks: • The school year is _______ into two semesters, the first of which is September through December, and the second January _______ May. We have a LONG summer
school. I don’t think I will be bored in Ms Shen’s class. In other words, there are three times as many girls as boys. Choose the best answer • 1. Our family will move to a new flat in the city
in football. A. In a word B. In other words C. At the same time D. In time 8. Will you introduce a ___ of study so that I can improve my English? A. way B. path C. road D. method Way泛指各种方法
ents were embarrassed at first. (人感到 )吃惊的,惊讶的 (事物 )令人吃惊的,令人惊讶的 (人感到 )尴尬的,难堪的 (事物 )令人尴尬的,难堪的 ed形式的形容词一般修饰人; ing形式的形容词一般修饰物。 Complete the sentences 1. bored/boring: (1) I wasn’t _____ with the lesson.
我对你所做的很失望。 I am disappointed in you. I’m disappointed with what you have done. 4. make corrections make mistakes Bob非常粗心,总是犯错误。 Bob is very careless and is always making mistakes. 我需要把作业改正一下。 I have
fficult as I expected. 4. fun un. a lot of/great fun。 make fun of P3 a. a fun house/person。 a funny looking Funny 用来指令人发笑的人或事物 Fun 做定语,用来指令人愉快的事物或喜欢与之相处的人( enjoybale 令人愉快的) He told a funny joke.
school last week, with the result that she missed an important 拉上周没上学,结果错过了一次重要考试。 • ④ His carelessness resulted in the terrible accident. • = The terrible accident resulted from his carelessness. •
C. has always been thought D. does think always 4. e, go, leave, arrive, start, fly, drive 等动词可用现在进行时表示安排和计划或即将发生的动作。 I want to know when he ___ for New York. A. has left B. is leaving C. had left D.
注意:如果 like, love, prefer前有would/should 时,后面则接动词不定式。 如: I’d like to go swimming this weekend. 本周我愿意游泳。 I would love to meet your parents. 我想见你的父母。 ③ begin, start, continue 后跟不定式和动词 ing形式,通常没有差别。