高中英语
n job that 5) Mrs. Mavis Wood was once taken away by 3. Role play Read the Para 28 and pick out the sentences said by different characters. Then work in groups of 6 to make up a dialogue and then act
的 . Eg. They look similar _______ appearance ________ each other. 这两个孩子看上去很相似。 【 拓展 】 ______________ n. 类似 , 相似;相似之处。 句中 known as 作 成分。 小试牛刀。 1) be known as _______ 2) be known for 3) be known to 4)
5) Mary, monitor of our class, was invited to the party too. (用同位语合并下列句子 ) 1) Mr. Smith is our new English teacher. He is very kind to us. — Mr. Smith, our new English teacher, is very kind to us. 2)
imagination of the story. Ask the whole class to skim and scan the passage, trying to find the answers to the following. (PPT10) ● Boy missing, police puzzled It’ s about ________ ● the first
Step 2 Listening and Reading 1. Ask the students to listen to the recorder, while listening, read after the tape as fluently as possible. Then answer the following questions: Q1: In which year were
ssage. In 1957 launch of the first artificial satellite Since 1959 Spaceships have been sent up into space In 1961 Yuri Gagarin travelled in space for the first time. In 1969 Neil Armstrong landed on
scientific explanation for it, we are not certain whether UFOs really exist, but we believe everything will be clear in the future.) Topic 1: about UFOs: (1) What do the letters UFO stand for? (2)
ause of, owing to due to由于 ,作表语或状语 ,一般不直于句首。 thanks to幸亏 ,多亏 ,由于 ,其后多是感恩性的内容。 because of 因为 ,由于 ,用作状 语。 owing to 由于 ,作表语或状语。 Our success is due to our parents and teachers. 我们的成功归功于我们的父母和老师。 Thanks
he statistics. And draw at least three more conclusions and make another three remendations. [Explanation] Statistics: • 65% of the students usually do reading after school • 14% of the students do
the following sentences ●Task 1: Fill in t he blanks according to the text 1. This incident ___________________ (已引起人们的极大关注 ) due to reports of strange lights in the sky and of alien visits around