冠词
冠词的复习
如: Who is captain of your team? John was elected chairman of the mittee. . turn作系动词时,后面 的名词前不用冠词。 如: He was a medical student before he turned writer. 地理名词前。 如: North America,Hunan Province
名词,冠词,代词,数词,形容词的用法和练习
n. A. the, the B. /, the C. /, a D. /, / 20. He said that he got ______ “ C” in the test. A. a B. an C. the D. / 代词 1)人称代词有主格人称代词,在句中充当主语: I,you, he, she, it, we, you, they和宾格人称代词,在句中充当宾语: me, you,