关于
58, when Baotou Iron and Steel Works began their mining operations, 250 million tons of ore had been mined at the main and eastern ore bodies, leaving a remaining ore volume of 350 million tons. At
state qα a The natural vibration frequencies and modes can be obtained from the above equation by using eigensolution procedures, ., subspace iteration methods. For the cablestayed bridge, its
arts along the mating direction, while checking interference in the other degrees of separation, until no interference occurs in all of the other degrees of separation. There is obviously a
oped “ Though the material products are quite rich now, the cultural consumption both in rural and urban areas in China still lags behind.”Professor Zheng Fengtian remarked over the status quo of
ted that it wants to clean up its act by boosting renewable power generation to 15 percent of the total power supply by 2020. Chinese smart grid proposals call for the integration of renewable power
重结构在安装和使用过程中的整体稳定性,提高结构的空间作用,减小屋架杆件在平面外的计算长度,应根据结构的形式、跨度、房屋高度、吊车吨位和所在地区的抗震设防烈度等设置支撑系统。 屋盖支撑 : 屋盖支撑系统包括横向支撑、竖向支撑、纵向支撑和系杆(刚性系杆和柔性系杆)。 设计屋盖支撑时应遵守以下原则: 1. 在设置有纵向支撑的水平面内必须设置横向支撑,并将二者布置为封闭型。 2. 所有横向支撑
工作电源因故障被断开以后,能迅速自动的将备用电源投入或将用电设备自动切换到备用电源上去,使用户不至于停电的一种自动装置简称备自投或 BZT 装置。 适用情况 以及优点 1)发电厂的厂用电和变电所的所用电。 2)有双电源供电的变电所和配电所,其中一个电源经常断开作为备用。 3)降压变电所内装有备用变压器和互为备用的母线段。 4)生产过程中某些重要的备用机组 采用 BZT 的优点 :
或减少损失,保证用户不间断供电。 BZT 定义:当工作电源因故障被断开以后,能迅速自动的将备用电源投入或将用电设备自动切换到备用电源上去,使用户不至于停电的一种自动装置简称备自投或 BZT 装置。 适用情况 以及优点 1)发电厂的厂用电和变电所的所用电。 2)有双电源供电的变电所和配电所,其中一个电源经常断开作为备用。 3)降压变电所内装有备用变压器和互为备用的母线段。 4)生产过程中某些重要
20% 左右的国有企业的教育培训费年人均仅 10 元~ 30 元; 30% 的企业只是象征性地拨一点培训费,年人均在 10 元以下;其他的国有企业多属亏损企业,已停止了对人力资本的投资。 相比之下,大多数外资企业都加大对员工培训的投资力度,通过开展员工培训来使企业保持强劲的竞争势头。 显然我国国有企业对员工培训的投资力度是不够的。 培训工作作为人力资源开发的一项系统工程,必须有计划性和针对性。
收票据按其到期价值转入应收账款,不再计算利息。 至 2020年 12 月 31 日,甲企业对该应收账款提取的坏账准备为 5000元。 乙企业由于发生财务困难,短期内资金紧张,于 2020 年12 月 31 日经与甲企业协商,达成债务重组协议。 ( 1)乙企业以产品一批偿还部分债务。 该批产品的账面价值为20200 元,公允价值为 30000 元,应交增值税税额为 5100 元。