过去
否定句: 疑问句: 肯定回答: 否定回答: 特殊疑问句: I was 30 years old last year. I was not 30 years old last year. Were you 30 years old last year? Yes, I was. No, I wasn’t. How old were you last year? 2.实义动词的一般过去时态 :
和意志方面也都有所发展,太多的说教只会激发他们的厌烦甚至是反感的情绪,所以在教学中采用适当的教学方法,通过步步设疑,逐步引导学生自己去发掘、去探索问题,从而让他们自己去真正意义上的体会歌曲的内涵。 : 知道叙事曲的一般特征,及三部曲式歌曲的特色。 : 体会“妈妈”在旧社会当中受到的不平等的遭遇,珍惜现在的来之不易的生活,忆苦思甜。 : 使学生初步养
ay evening. 昨天晚上你及时完成家庭作业了吗。 When was your letter written The day before yesterday. 你的信是什么时候写的。 前天吗。 Why was this problem not worked out by you? 为什么你没有解出这道试题。 Your bike was not repaired last night
1、2016/11/28 该课件由【语文公社】1/28 该课件由【语文公社】1/28 该课件由【语文公社】1/28 该课件由【语文公社】1/28 该课件由【语文公社】1/28 该课件由【语文公社】按民间习俗,腊月二十三就算过“小年”。 二十三,糖瓜粘;二十四,扫房子;二十五,炸豆腐;二十六,煮白肉;二十七,杀公鸡;二十八,把面发;二十九,蒸馒头;三十晚上熬一宿;年初一,扭一扭。
invite B. invited C. is invited D. was invited 6. The boy with short hair __________ Little Tiger by his parents. A. calls B. called C. is calling D. is called 7. He likes reading very much. Most of
_(travel) much faster than sound. 13. She’ll write to you as soon as she ________ (get) there. 14. I didn’t leave until the rain ________(stop). 15*. Don’t e u_______ I telephone you. 16*. You will
evening he ___________ (write) that letter. 2. 他说他以前见过你。 He said that he ____________(see) you before. 3. 当我进来时,他已做完了作业。 When I came in he ________________(finish) his homework. 过去完成时与 by then(截止到那时
“亲近的、亲密的” close friends 2. My alarm clock didn’t go off, … 闹钟没有响 …… go off 意为“(闹钟)闹响 ”。 . Although the alarm clock went off, he didn’t wake up. 虽然闹钟大响 , 但是他还是没有醒来。 3. wait for sb. “等某人”, wait to do
t watch watched visit visited stay stayed Live lived shop shopped trip tripped study studied drink drank read read bringbrought buy bought see saw have had take took Pair work A: What did you do last
ll→ called[k: ld], play→ played[pleid]。 在 [t]和 [d]音后面发 [id]。 如:want→ wanted[wntid], need→ needed[ni:did]. 一般过去时态常见的基本用法 • 的状态 Liu Jie got up at 7: 10 this morning. He was a student three years ago.