过去分词
ally saved by the local police. A. Having trapped B. Trapped C. Being trapped D. Trapping 3. When ___________ for his views about his teaching job, Philip said he found it very interesting and
lage, he knows a lot of people there. 过去分词作 原因状语 相当于原因状语从句 (Because he was) born and brought up in the village, he knows a lot of people there. . 4. Defeated many times, they continue to fight. 过去分词作
uilding roads. (主动 ) = •He worked as a worker who/ that built roads. •A pop star is a singer singing pop songs (主动 ) = •A pop star is a singer who/ that sings pop songs. •This is a picture painted by
ted by his wife 我和父亲坐在桌子旁边讨论着我的工作问题。 __________________________, my father and I were talking about my job. Seated at the table (短语)作状语时,也可在其前面加上连词 ________________________等,以便明确作何种状语。 when, if, once
为过去分词作状语 , 它的逻辑主语为主句主语 I , 即 I 被再给一个小时。 ) (2) Seen from the top of the hill, the city looks more beautiful to us. 从山顶看城市 , 城市显得更漂亮。 ( seen 为过去分词作状语 , 表 “ 被看 ” , 由语境可知 , 它的逻辑主语必须是城市 , 而不是 “ 我们 ” , 因为
go off, and by the time I woke up, my father had already gone into the bathroom and I had to wait for him to e out. I had to really rush. I took a quick shower, had some breakfast, and then ran off