汉译英
汉译英难点解析500例(doc32)-经营管理(编辑修改稿)
old. She‟s never been as rebellious as other children. be green with envy 王先生的成功使得周围很多人都嫉妒 Mr. Wang‟s success has made many people around him green with envy. swear like a trooper 那个家伙的嘴特别脏
四六级考试汉译英练习(编辑修改稿)
nything about it. 一、倍数增减的表示法 1) is times greater than Force N2 (考点:倍数 + 形容词 /副词比较级 + than) 2) reacts three times as fast as the other one (考点:倍数 + as + 形容词 /副词 + as) 3) is 49 times the size of the