横向
高层结构建筑外文翻译--框架横向刚度估计和横向刚度线性与非线性的连续模型的静力分析(编辑修改稿)
e buildings for their flexural and shear beam contributions because the overall behavior of continuum model is governed by the changes in EI and GA. Equation 2 shows the putation of GA for a single