计算机科学
计算机科学与技术外文翻译--未来的数据采集:“云计算”将替代传统数据记录仪?(编辑修改稿)
software program (known as embedded firmware) is stored on the data logger that controls the logger’s processes – some of which are defined by the user, such as the logging intervals from connected
计算机科学外文翻译(编辑修改稿)
ecause each binomial tree in a binomial heap corresponds to a bit in the binary representation of its size, there is an analogy between the merging of two heaps and the binary addition of the sizes
计算机科学与技术外文翻译--详细解析java中抽象类和接口的区别(编辑修改稿)
now requires more filled with alarm function. How can we design according to the example of the class hierarchy? (in this case, it is mainly to show abstract class and with reflected in the design