机械加工
4) 拟订工艺路线。 5) 确定各工序的加工余量,计算工序尺寸及公差。 6) 确定各工序所用的设备及刀具、夹具、量具和辅助工具。 7) 确定切削用量及工时定额。 8) 确定各主要工序的技术要求及检验方法。 9) 填写工艺文件。 四 . 工艺文 件的格式 将工艺规程的内容,填入一定格式的卡片,即成为生产准备和施工依据的工艺文件。 常用的工艺文件格式有下列几种: (1)综合工艺过程卡片
local optimal solution. Numerous constraints and number of passes make the machining optimization problem more plicated. So, it was decided to employ geic algorithms as an optimization technique. GA
on endmill probably has 10 grains holding the core together,” Burton noted. He added that he has seen carbide powder containing grains, which is about half the size of what’s mercially available, but
n set up and evaluate packing profiles to determine the optimal packing pressure and duration of packing. Using the packing analysis results, mold designers can identify areas of high, nonuniform
sor digital actuation system。 The straight line rolls the guide rail system。 High speed automatic highquality goods (2 ~ 3 seconds)。 The occupying a land area of is pact。 According to manmachine
的研究和应用方面积累了经验,并为其发展奠定了基础。 自动化 控制 的发展趋势 随着科学技术的飞速发展和社会的不断进步,先进的生产模 式对自动化系统及技术提供了多种不同要求,这些要求也同时代表了机械制造自动化技术将向可编程适度自动化信息化智能化方向发展的趋势。 ( 1) 高度智能集成性。 智能集成化制造系统可以根据外部环境的变化自动地调整自身的运行参数,使自己始终处于最佳运行状态