建筑学
建筑学外文翻译(2)-建筑结构(编辑修改稿)
ut Sea and water features that affect the tropical beach resort overall layout of the important factors, such as sea view location, the hotel building and sand transport connections, swimming pools
建筑学毕业设计外文翻译--玻璃纤维时代的来临-建筑结构(编辑修改稿)
the strength, stability and low maintenance characteristics of fiberglass. These windows resemble traditional painted wood windows with factory applied exterior colors. Quite recently, manufacturers