尽量减少
专家系统方法,以尽量减少人才外流的影响外文翻译(编辑修改稿)
in from the developing countries. The results of these studies strongly suggest that prospects of such slowdown, if any, are very limited. One study, Kwok and Leland (1982) examines the issue as to