模具设计
le, flashing was reduced by reducing the packing pressure of the machine. Warpage can be controlled by controlling various parameters such as the injection time, injection temperature and melting
栅格分析已被广泛用于冲压车间的测量应力 分布当中,因此能够通过测绘成型极限图的有规则的应力来分析金属片的可冲压性。 圆栅格比其他类型的栅格例如方形栅格有主要的优势,因为它们没有任何的方向性,这种优势在于圆变形后会成为椭圆。 这两个主要的方向清晰地通过长轴与短轴展示出来。 通过在成型极限图上测量长轴与短轴的长度得出主张力的大小,就能够估计成形部分的区域。 在目前的研究中
and structure . (4) Develops the ability badly, economic efficiency unsatisfactory our country mold enterprise technical personnel proportion low The level is lower, also does not take the product
of operational procedures using both the experimental approach and the finite element analysis. Fig. 1. Flange of hinges at notebook top cover case. (a) Hinge, (b) top cover case and (c) flanges of
niputers”had dll of the characteristics of full scale puters,but they were smaller and considerably less smaller puters called microputers followed soon after. The 1970’s saw continued advances in
卸料力、推件力、顶件力 ,如表 所示 n同时卡在凹模内的工件数量 式中 h凹模内的直刃壁高度 t板料厚度 表 、推件力及顶件力系数 冲裁材料 Kx Kt Kd 纯铜、黄铜 ~ ~ 铝、铝合金 ~ ~ 钢 材料厚度mm ~ ~ ~ ~ 0055 ~ ~ ~ ~ ~ 查表 Kx= KD= 总冲压力 Fz 总冲压力是各种冲压工艺的总和,根据不同的模具结构计算
卸料力、推件力、顶件力 ,如表 所示 n同时卡在 凹模内的工件数量 式中 h凹模内的直刃壁高度 t板料厚度 表 、推件力及顶件力系数 冲裁材料 Kx Kt Kd 纯铜、黄铜 ~ ~ 铝、铝合金 ~ ~ 钢 材料厚度mm ~ ~ ~ ~ 0055 ~ ~ ~ ~ ~ 查表 Kx= KD= 总冲压力 Fz 总冲压力是各种冲压工艺的总和,根据不同的模具结构计算
卸料力 Fx=KxF ( 23) 推件力 Ft=nKtF ( 24) 顶件力 Fd=KdF ( 25) 式中 Kx、 Kt、 Kd 卸料力、推件力、顶件力 ,如表 所示 n同时卡在凹模内的工件数量 式中 h凹模内的直刃壁高度 t板料厚度 表 、推件力及顶件力系数 冲裁材料 Kx Kt Kd 纯铜、黄铜 ~ ~ 铝、铝合金 ~ ~ 钢 材料厚度mm ~ ~ ~ ~ 0055 ~ ~ ~ ~ ~
简直定、压力中心计算、刃口尺 寸计算、压力机选择、定位方案、 推件、出件装配简直定等 , 模具整装配图以及模具主要零件的设计。 研究方法或工程技术方案 : 此零件结构复杂,需要多道工序完成,基本工序包括落料、拉深、冲孔、弯曲、翻边等。 针对此产品件,应明确设计路线,确定设计方案,构思模具结构。 首先对产品进行结构和尺寸分析,利用 AUTOCAD 绘出零件的三向视图,确定尺寸
K系数(一般取 K=) 卸料力 Fx=KxF ( 23) 推件力 Ft=nKtF ( 24) 顶件力 Fd=KdF ( 25) 阜阳职业技术学院 学院 11 式中 Kx、 Kt、 Kd 卸料力、推件力、顶件力 ,如表 所示 n同时卡在凹模内 的工件数量 式中 h凹模内的直刃壁高度 t板料厚度 表 、推件力及顶件力系数 冲裁材料 Kx Kt Kd 纯铜、黄铜 ~ ~ 铝、铝合金 ~ ~ 钢