optical
optical_network_of_sdh__graduate__thesiss毕业设计论文(编辑修改稿)
mission is carried out row wise from left to right and from top to bottom. Bits are transmitted serially. The STS1 frame of SDH is posed of section overhead, transport overhead, payload overhead and