亲代
亲代照顾和交配体系parentalcareandmatingsystems(编辑修改稿)
utside the mother’s body Male birds are as capable as their mates at providing care Incubation, feeding, and guarding are divided equally Two parents are better than one Ayo 教材 (動物行為學 2020) 29