sh3510
sh3510-2000石油化工设备混凝土基础工程施工及验收规范英文版
turned to installation, its axis, elevation and value of elevation shall be marked. — 9 — 3. Form panel, steel reinforcement and concrete works Formworks The installation scheme, as well as type,