sharing
高三英语sharing课件
眠药马上见效。 • (4),工作 • The sewingmachine doesn’ t operate properly. • 这台缝纫机无法正常运转。 • 8. The doctor said that the patient had________at once. • A. to operate B. to be operated • C. operated D. to be