试题
1、光世昌老师高中物理精品资源免费下载地址 (2013 辽宁大连高三第一次模拟考试理科综合试题,18)如图所示,R 1、R 2、R 3 为定值电阻,S 0、S 1 为开关, 别为理想电压表与电流表。 初始时 闭合,现将 ( )A 的读数变大, 的读数变小B 的读数变大, 的读数变大C 的读数变小, 的读数变小D 的读数变小, 的读数变大2.(2014 江西重点中学协作体高三年级第一次联考
but he decided not to. He wanted to arrive on time the next morning. At about 11:00 ., another ship, the Stockholm, suddenly hit the Andrea Doria. It made a huge hole in the Italian ship. Some people
. I was being good at spoken English and interested in the different way of living in London. Most important of all. I did not want to leave my 6 who were near and dear to me during the two long
being good at spoken English and interested in the different way of living in London. Most important of all. I did not want to leave my 6 who were near and dear to me during the two long years. I
1、1996 年翻译试题in of of 71)of of of in to of in of to in to of is a it is a 72)ar,to a to of be in It be to It is to as a or to be in 73)by a of to of in of of on as to of a of is of is of as a is to of
1、1999 年翻译 试题(71)as of as to as to of in of of is it in is it is or of is to an 72)in to of as an to to to an of to be to a by of of 73)by to of in is a in 74)is no to to in or to to of so by of“”to
1、1998 年翻译 试题by a of 5 71)to 5 at S in as in an a of (72)of in 920s,to as of to as a of in as it of of by is to to as of of to 73)at in on 74 )If as be a a of on,in by a in a by a of 75)it is a of in
1、2000 年翻译 试题on of on of 71 )of of as (72 )it is of a is up of in of of It to in in to up it is to in up of of or in to of or or in of to n on of 73)to in to to At of is at a (74)in of in a a in a or
1、1997 年翻译 试题Do is is a to 71 )it it is an of is of be it a of an of of a is so is is by no an to to to it is a to it:do to is on of of is 73)It to at it to be to or no at is a to is we a at 74)in of
1、1994 年翻译 试题to of is an in of 71)so of of as of 72 ) “In a of “as we it,of a of of in (73)as a of by of to,of in of of a an s at of of of of at of 74 )s 609 he to on to of to of in of is in 75)of at