特征描述
外貌特征描述词汇
er eyes were pale green without a touch of hazel, starred with bristly black lashes and slightly tilted at the ends. 她的眼珠子是一味的淡绿色, 不杂一丝儿的茶褐,周围竖着一圈儿粗黑的睫毛,眼角微微有点翘。 Above them, her thick black brows