土堆
生产建设项目弃土堆置体下垫面概化与水土流失特征研究_硕士学位论文(编辑修改稿)
ence (P).Therefore, appropriate measures of soil and water conservation should be taken for this type of spoilbank in engineering practice, to reduce the harmful influence of soil and water erosion。