u2
ke. she have a good time? Yes, she did. ride a horse (rode) horse climb the Tianshan Mountain 攀登 ,爬 (climbed) visit the Tianchi Lake (visited) Lingling39。 s travel Last July Lingling went
and your book. B. –Excuse me. Is this your ball? No, it’s not my ball. I think it’s his ball. C. –Look, this is my ruler. And this is my eraser. It’s nice. D. Jill: Is it a pencil sharpener? Mrs
her told me. → The teac her told me the earth _______ around the sun and the moon _______ around the earth。 ② 直接引语是过去进行时,时态不变。 Eg: Jack said, “John, where were you going when I met you in the street
音及拼写。 ( brother, sister, father, mother, parent, grandfather) Step 3 呈现( Presentation) 1a 1b。 听录音,在 1a ,学生反复跟读。 Step 4 教与练( Teaching and practice) 1c。 学生分角色表演 1a 2. A: That’s my family. T
3. 1d These are my parents and this is my grandpa. This is my friend Lin Fang. Step 5 巩固( Consolidation) ,以小组为单 位介绍自己的家庭 2. A:(指着一人): Who’s he? B: He’s my father./ A: Who’s she?/who are they? B: She
led, with the name of The boy called Li Lei is here. I lent him the book with the name of Red Star Over China . ( 2) who 在这里引导一个定语从句。 定语从句常用 who/that 作引导词代人,用 which/that I have a pen which/that is 20
3)利用所学基本句型谈论自己的家庭照片,在下一堂课带到课堂,与同伴轮流谈论图片上的人物。 (完成 3c) Written: 1)抄写语法焦点上的句子。 2)介绍 3b 图片中的人物,写出句子,不少于五句。 The Third Period (Section B 1a – 1d) Teaching aims (教学目标) 1. 学会说家庭成员的称谓。 2. 学会谈论家庭成员。 3.
____________________________________________________________________________________________________________________________________________________________________ Hello, every one. Iam tony. I have
b 中照片中的人物进行问答。 (每个人物 A: Who’s she? B: She’s Cindy. A: Who’s he? B: He’s 2d ( 1) Who’s Kate? ( 2) Who’s Jane? 2d 对话,并让 23。 Step 5 巩固( Consolidation) 1. 3a 3b。 看 3b 中图片,从方框中选词造句,给优胜者奖励。 3c。 学生根据自带的
entation) 2a。 教师利用多媒体课件把本单元的名字展示出来。 让学 2b。 读 2b 3. ( 1) Is his father in the first picture? ( 2) Who are the two girls? ( 3) What is Coco? 文,完成 2c 任务。 Step 4 教与练( Teaching and practice) 2b 10 3.