外文
t Total Cost 1664 829 326 2819 % % % % Capital costs, at percent, represented a notable portion of Company X’s total costs. This relatively high capital costs could be explained by high investments
ides a detailed discussion of CFROI. (3) Return on Invested Capital (ROIC)—ROIC is defined as the ratio of operating profits less adjusted taxes (NOPLAT) to invested capital. See Copeland, et al.,
se of department heads for approval, and Finance department consent, to pay the purchasing department to conduct procurement。 urgent needs to develop a special request to buy a special approval
ion of the landslide is refers to the part of the gravity of soil slope under one of the sliding surface sliding, mainly because of the soil slope of embankment caused by inadequate stability of
ce draw handy on is it ask datum line , instrument of sensor to bear first(23mm steel wire rope), then it set up well all (from 10m),according to hanging wire that measure being the higher to confirm
Tool features have been identified by many names. The technical literature is full of confusing terminology. Thus in the attempt to clear up existing disorganized conceptions and nomenclature, the
achined when the material must be fed through spindle. The tailsticd assembly consists, essentially, of three parts. A lower casting fits on the inner ways of the bed and can slide longitudinally
作棍直径。 很显然工作棍的水平偏移对激励的灵敏度有很大的影响。 例如,考虑到中间棍弯曲的影响,会得到灵敏度由其它的小扰动影响的二维结果。 与此相反,如果存在工作棍水平偏移,则灵敏度会出现出新组分。 图 6 表示中间棍激励的灵敏度是如何受( a)工作棍直径( 也与中间棍有关)和( b)水平偏移的影响而改变的。 瀑布似的图形表示了灵敏度大小沿板带边沿的变化,图 6b
sts a continuous discretization of the contact interface. The main contribution of the present paper is in the identification of a genneral procedure according to which the twobody problem is
ument, the domestic electric appliances, the numericallycontrolled machine tool, the industrial control and so on the electromechanical device and the product uses the monolithic integrated circuit