外文
ostly between 1/250 and 1/500. Thus, if a random bitstream is fed into the decoder after training it to this point, an average of 250 to 500 symbols will be processed before the stop symbol is
rity mechanisms. (3) Auditing and monitoring technology. Responsible for safety audits of all kinds of surveillance systems and securityrelated incidents, generating security logs, and provide
进行考虑。 2. Air conditioning energy conservation system research survey 1) Through the load control, achieves the energy conservation goal. (a) The 6 burning hot season new atmosphere load occupies the
ed the target’s echo as well as the wave from the broadcast station through multipath propagation effect. As the radar crosssection(RCS) of the target is uaually very small, the echo wave of the
the deadtime pensation algorithm according to the pensation rules table TABLE I. III. EXPERIMENTS In order to test and verify the proposed deadtime pensation method of SVPWM, experiments are
coordinate values set by the memory, reset back to zero run is no longer working, will need to rerun the tool and reset to XαZβ location G50. If it is production, processing, after the End of a
a group holding registers, the code will produce the following functions: 00000011 (hexadecimal 03H) Normal response es from the device to respond only to the same function code. Objection response,
ode to query next hop routing information for application messages. The forwarding decision is made usi ng logical addresses of the overlay nodes. Each overlay socket has two work adapters that each
erlying physical phenomena, and proceeded to statistical fading models, which are more appropriate for the design and performance analysis of munication schemes. We will in fact see a lot of
前流行的操作系统,Labview 主要发展历程如下: 年 4 月, Labview 开发系统在美国德克萨斯州奥斯汀研制成功 年 5 月, NI 公司推出了 Labview Beta 测试版 年 10 月, NI 公司正式发布了 for Macintosh 版本 年 1 月, 问世 年 8 月,支持 SUN Solaris 工作站和 PC 的 Labview 版本面世 年 1 月, 版本开发完成