文献
most, heavily, from where and for how long. This information contributes to improved measures of the results of promotional efforts. The promotional costs associated with the Inter have also been
[11] Nobuhiko Ishii, Tatsuo Shimizu, Phys. Rev. B 42 (1990) 9697. [12] . Wei, . Xu, . Wang, . Wang, Vacuum 81 (2020) 656. [13] M. Marinov, N. Zotov, Phys. Rev. B 55 (1997) 2938. [14] D. Beeman, R.
fuzzy output ponents. It was then necessary to take the maximum of these values as the fuzzy value for each ponent. Finally, these fuzzy output values were defuzzified using the maxproduct technique
mics equations of the parallel manipulator are derived using Kane method, according to the theory, the active forces are equal to inertial forces, the dynamics statespace equation can be written by τ
to develop teaching manipulator, puter controlled manipulator and the bined machinery hands. At the same time to increase speed, reduce the impact, correct positioning, in order to better play the
d the management of small and mediumsized and HR are not fully aware of precisely this point, so that the specific process of the formulation and implementation of a lack of sufficient attention, at
puter virus carriers sometimes can be deleted documents Or lowlevel formatted drives, and other measures to eliminate the virus pletely, and the work once a puter work Clean stations failed to
ollected room temperature and hope, and reaction temperature pared to open or close small heater, thus controlling environmental temperature. The importance of the study lies in the feedback loop
dge or links). Nodes represent sites for workstation and parking areas for vehicle and serve as pickup and dropoff points for loads. A demand could be generated in the form of pickup loads at any
pes, such as strings and arrays. It also contains classes for working with random numbers and dates and times. You can uniquely identify any class in the .NET framework by using the full namespace of