修改稿
clause” should be used in its base form or used together with the modal auxiliary “should”. I remend that he (should) try the new medicine. 我建议他试试这种新药。 ( 3) The verb “remend” in this sense can also
ated inspected installed instituted interpreted introduced invented investigated justified led localized located made managed maintained mechanized merged moderated motivated negotiated opened
o make less angry, excited or anxious, fort or calm, to make less painful soothing words soothe one‟s feelings 34. shingle: a small thin piece of building material (such as wood) often with one end
s. Low mechanical strength. Expensive. Nonstick coatings. gaskets, packings, bearings, high and low temperature electrical and medical products, other applications needing excellent dielectric
*/ uchar timer1tflg。 /*定时器定时完成标志 */ /*************************************** 函数名称: void timer0int() interrupt 1 功能描述: 定时器 0 中断用来产生方波 输入: 无 输出: 无 全局变量: TH0,TL0,P5 调用模块: 无
ease five me, my lord. (3)婆子笑道:“却是甚话。 便是押司生得凶眼,又酒性不好,专要杀人。 休取笑 老身。 ” —— 《水浒传》 —— The old woman laughed and said, ―What talk is this? Are your eyes fierce and is your temper evil when you drink, and
elt is “biased” in favor of one helicity. Polyolefins are mainly considered as structural materials. However, more recently, one crystal modification of syndiotactic polystyrene was shown to include
of System and Applied Mathematics, China Academy of Sciences Wu Wenjun, born in Shanghai in May 1919, was graduated from Shanghai Jiaotong University in 1940. In 1947, he went to France for advanced
Cloth 0691127034 $ USC The Life of Birds. D. Attenborough. (1998) 320 pp. Cloth 069101633X $ USC The Life of Mammals. D. Attenborough. (2020) 320 pp. Cloth 0691113246 $ USC Life on Air: Memoirs of a
ITE 1900, SAN DIEGO, USA, CA, 921014495 84. ADVANCES IN BIOPHYSICS Annual ISSN: 0065227X JAPAN SCIENTIFIC SOC PRESS, 210 HONGO, 6CHOME, BUNKYOKU, TOKYO, JAPAN, 113 85. ADVANCES IN BOTANICAL RESEARCH