英文
l furnish to all Partners a yearend balance sheet for the Partnership and a full and detailed financial report on the business operations of the Partnership for and during the entire preceding year.
ertake the responsibility for any damage, loss of goods during the transportation. 4. 4 甲方在来料检验时对来料批判定为不合格批时,应及时通知乙方,乙方应当在 ______小时内派人进行确认。 Party A should notify Party B if unacceptable defects and
这些工程师还为建筑业主定期提供进度报告。 The engineer who is engaged in munity and city planning this aspect may program and develop a munity in city or the whole this programming including far and far not only only is
required to consummate the Transactions. GAAP means generally accepted accounting principles set forth in the opinions and pronouncements of the Accounting Principles Board of the American Institute
turnover 100 lots in the first year, and increase the number by 50% until the annual turnover reach 200 lots. In case that Party B’s annual turnover surpasses the promised minimum number, Party A
nationally recognized securities exchange (including the Stock Exchange of Hong Kong) or the NASDAQ National Market or the issue or transfer of shares in a pany whose shares are listed on an
sed. 第八条 费用分担 除另有约定,所有费用和支出,如电讯费、差旅费以及其他相关销售费用,都应由代理商承担。 此外,代理商还应承担维持其办公处所、销售人员以及用于执行卖方有关代理商义务的所有指令而发生的费用。 Article 8 Expenses all expenses and disbursements such as cabling,travelling and other
ividual bits of memory or I/O since many controller applications involve the turning on and off of single output lines or the reading the single line. These lines are readily interfaced to twostate
iateunderstanding of the effects of cochannel interference on the capacity andperformance is therefore required when deploying cellular systems, or when analyzingand designing system methodologies
Podcast 学英文 podcast 资源 englishpodcast 897/ odcast?start。