英文翻译
e of classical PID controller for both the tracking problem and the step disturbance rejection. The fuzzy sets are assumed to have initially symmetrical layout and the parameters of both regulators
rspective, for several decades to promote switching power supply performance and constantly improve the technological level This should mark is: 1. A new highfrequency power semiconductor devices to
arts along the mating direction, while checking interference in the other degrees of separation, until no interference occurs in all of the other degrees of separation. There is obviously a
ms transferred from other large equipment reserve, even bought some of the projects do not require the equipment, resulting in longterm suspension equipment. , Construction ⑺ unreasonable
could operate only a few minutes without a tube failing. In addition, the puter weighed many tons and was very difficult to program. ENIAC was programmed through the use of thousands of switches. The
ding dimensional, geometric and surface accuracy. If the quality level after machining is poor and if it cannot meet the requirements, there will be a varying need of manual finishing work. This work
generator output voltage is sensed and pared to a fixed reference voltage deviation from the reference voltage gives an error signal that is fed to a power amplifier. The power amplifier supplies the
grammers were largely insulated from these API differences because they wrote to the MFC standard, which was designed to work with either Win16 or Win32 underneath. Bitmaps Without graphics images,
he mobile to the base station are referred to as reverse channels. The forward and reverse channels together identify a duplex cellular channel. When frequency division duplex (FDD) is used, the