中英文
lower ( 18) 管式反应器 Tubular Reactor ( 19) 过滤机 Filter ( 20) 过滤器 filters ( 21) 化工成套 Chemical sets ( 22) 化工成型 Chemical Molding ( 23) 化工管道 Piping ( 24) 化工设备代理 Acting chemical equipment ( 25) 化工实验设备
这三层分别是依赖型自尊 independent selfesteem,独立型自尊 and unconditional selfesteem 和无条件型自尊 Dependent selfesteem,the two ponents of it,依赖型自尊,它有两个构成部分 First of all,首先 person with high dependence needs the accolades
able to make the 书里写道的那些人 和一般人的不同之处在于他们能够好好 best of what happens. They see it as an opportunity, a learning 利用已经发生的事 他们将这些事情看成机遇 experience, stepping stone. The importance of failure for 一种学习经历 一块垫脚石
长时间,即使你做得来。 More does not necessarily mean better. 更多并不意味着更好。 Again, unless you are training for Olympics, in which case you do want to get to 100 percent of your maximum heart rate at times, for
兄弟, 阿格诺尔 I39。 m your cousin, Agenor. 我是宙斯的儿子 I39。 m the son of Zeus. 我是半神,和你一样被遗弃了 Halfgod and abandoned just like you. 如果是我的父亲派你来 If my father sent you... 我不想跟你有任 何瓜葛 ...I want nothing to do with
Thin Gate Valves 不封闭式 Unseal type 槽车 Tank Lorry Ball Valves 颤振 Flutter 常闭式 Normally closed type 常开式 Normally open type 超 Cryogenic valve 超高压 Super high pressure valve 超过 压力 Overpressure of a safety
High pressure valve 格兰密封 gland 隔离阀 isolating valve 隔膜 Diaphragm 隔膜阀 diaphragm valve 隔膜式控制阀 diaphragm operated trol valve 工作背压 Operating back pressure 工作温度 Operating temperature 工作温度 Working
a legend. He looks silly, there is a strong running legs, has been kept running, do not know why. Like his mother say, Life is like a box of chocolate, you do not know where the next one out of what
ion result in 《 Product Inspection Record》 and determine whether qualified or not。 and put green sticker and red sticker。 green sticker standard for qualified, red sticker stand for unqualified。
rsonnel involved in the Company39。 s safety management system have an adequate understanding of relevant rules, regulations, codes and guidelines. 公司应当保证与其安全管理体系有关的所有人员充分理解有关法规、规定、规则和指 南。 The Company